1 Hotel & Residences Delayed

Posted on September 12 2007

Work on 1 Hotel & Residences (website) has been delayed till early 2008 prompted by a design change and a city moratorium on heavy concrete work during the holidays.

Boosted by considerable interest in the City Suites, individually-owned condo units available for rental through the hotel, the developer is reconfiguring the design by replacing three floors of traditional condo units with City Suites. As a result, there will only be 51 traditional condo units, a reduction of 47 units. The developer feels there is a demand for these unique homes as 100 of the 110 available City Suites have been reserved so far, ranging from $500,000 to $1.4 million. (Update: with the reconfiguration there will be 176 City Suites on floors 9 through 16).

Other changes include relocating a two-level restaurant to the SW corner at Second Ave & Pine St. The new Stephen Hansen restaurant will feature seafood and organic fare from local sustainable farms.

Similar posts you may find interesting:

  1. 1 Hotel & Residences
  2. 1 Hotel, Where R U?
  3. 1 Hotel & Residences update
  4. Updated Renderings of Candela
  5. 1 Hotel Soiree

This post was written by:

Ben Kakimoto - who has written 398 posts on The Seattle Condo Blog.

Leave a Reply

Comment policy

SEARCH The Seattle Condo Blog

   Updated Comment policy

 

Sign up for our Condo Newsletter



  • New Condo Projects

    Downtown Area

    More Condos


    Queen Anne Condos


    Capitol Hill Area

    More Condos


    North Seattle

    More Condos


    West Seattle


    Eastside Condos


    Bellevue